Earthing and Lightning Protection | Call Earthing Solutions (02) 9608 9844    LinkedIn logo

Nepean Water Avon Dam

Project Details

Client : Stowe Australia on behalf of Sydney Water
Type : Lightning Protection System
Date : Jan 2025
Scope of project:

Supply, installation, and testing of lightning protection system for the pump room structure and building including:

  • 4 x lightning rods
  • Down conductors
  • Electrodes
  • Clamps
  • Pits

The Challenge:

The location was tight and access was difficult due to the existing infrastructure and buildings. The project required working at heights equipment including an elevated work platform.

Result:

The project was completed successfully, on time and on budget.