Anzac Parade Light Rail Traction Substation

Project Details

Client : CD Commercial on Behalf of Alstom/Acciona
Type : Traction Substation
Date : 2017
Scope of project:

Anzac Parade Light Rail Traction Substation

Supply and installation of earthing and bonding for Sydney Light Rail Traction Substation including 4 20m x electrodes drilled in Rock at basement level.

This is the initial stages of the traction substation earthing and bonding installation,the access was tight but the drilling equipment that was used dealt with the conditions with ease,the remaining works involve supply and installation of copper earth loop bar in basement along with bonding to various equipment in basement and ground floor,this is 1 of 8 substations that Earthing solutions has in construction on the Sydney Light Rail  project.