Client : UEA
Type : Chamber Substation Earth Grid
Date : January 2017
Scope of project:

Supply and installation of separate earth grid for Ausgrid Chamber Substation including drilling of 5.4m electrodes in level 3 basement of building,supply and installation of specialized galvanized risers and draw in boxes to accommodate 70mm2 XLPE cable taken to ground floor level.

The supply and installation of the earth grid components of the project required specialized drilling equipment and the 105 drill rig was the perfect fit as the drill was purpose built for such installations.The installation of the galvanized risers was challenging due to the confined areas of the basement.

The project was completed successfully to the clients satisfaction.