Lilyvale Sydney Trains Substation Upgrade
Supply and installation of 20 x 3.6m electrodes including non destructive excavation,Cadweld connections and 3 pole FOP and doctor testing,
This project was carried out with a very tight time frame including the all electrodes and associated works completed with coordinated de energizations and a possession weekend due to live substation restriction’s.The existing buried earth grid wss excavated with vacuum non destrucvtive method and all connection to the existing earth grid Cadweld connections with doctor testing of such.
The project was completed on time and the client was more than happy with the final outcome