Menangle Park Sewerage Network

Project Details

Client : Thompson Controls on behalf of Sydney Water
Type : Supply and installation of earth grid and electrode
Date : July-August 2026
Scope of project:

Supply and installation of earth grid including:

  • 120mm2 bare earth grid
  • cadweld connections
  • ductor testing of inground connections
  • 3m electrode
  • embedded welding of equipment slabs including bonding connections and testing.

Challenge:

The project was carried out under tight access conditions and within a narrow installation timeframe. Flexibility and close coordination with other contractors was required. Safety was a high priority throughout, and the project was completed on time and without incident.

Result:

The project was completed successfully to the design requirements and to the client’s satisfaction.