Minto Traction Substation

Project Details

Client : Downer Group
Type : Traction Substation
Date : 2016-2017
Scope of project:

Supply and installation of earthing and bonding for Sydney Trains Traction Substation including 8 x electrodes,70mm2 buried grading ring,basement 3 x transformer bunds and ground floor equipotential earth bar fitout including bonds to equipment and structure.

The supply and installation of the earthing and bonding system installation required specialized drilling equipment along with specialized materials.The project was made challenging due to confined areas required for the fitout and tight coordination.The project is close to completion and on time.