Schweppes Australia Huntingwood

Project Details

Client : Transelect
Type : Upgrade Transformer Earth Grid and Current Injection Test
Date : 2015
Scope of project:

Supply and installation of earth grid for upgrade of new transformer including 120mm2 bare c/u grading ring,120mm2 G/Y insulated connections,4 x 5m deep earth electrodes.

The supply and installation of the earth grid was carried out in existing concrete surface conditions,concrete saw cutting along with existing service location was required.The presence of an existing live substation required additional care and safety precautions.

Current injection testing was carried out prior to the energisation of the new transformer along with a detailed report.

The project was completed successfully to the design requirements and the step-touch potential recommendations.