Menangle Park Sewerage Network
Supply and installation of earth grid including: 120mm2 bare earth grid cadweld connections ductor testing of inground connections 3m electrode embedded welding of equipment slabs including bonding connections and testing. Challenge: The project was carried out under tight access conditions and within a narrow installation timeframe. Flexibility and close coordination with other contractors was required.
Menangle Park Sewerage Network Read More »











